Welding socket 150

Welding socket 150

When steel beams are used in the building construction a Welding socket with integrated post lock should be designed as an attachment of edge protection. In these cases the Welding socket is welded according to the instructions when producing the steel beams. When the beam has been lifted in place Post 1,3 m and Barrier 2,6 are mounted. The attachment of the edge protection will become both safer and faster with a pre-fabricated attachment such as this one.

• For welding on steel structures.
• Available with and without bottom.
• Integrated post lock.
• Untreated.
• Standard height 150 mm.

Art. No. 914009

Product sheet

Temporary edge protection on steel beams

Temporary edge protection on steel beams

welding_socket_safetyrespect_020x

beams_and_columns_safetyrespect_006